Construction

Construction Hub

Material reference prices, vetted contractors, and build cost estimates

Find a Builder

Match verified contractors by city, budget, and plot size. Contact via WhatsApp or submit a quote request.

Find a builder

Residential build cost estimator

Model plot price plus construction by finish tier (economy / standard / premium). Get total cost, finished-house FMV, and 5-year appreciation.

  • Economy — ₨3,500/sqft
  • Standard — ₨5,500/sqft
  • Premium — ₨8,500/sqft
Open build-out calculator

Construction 101 for first-time builders

A practical overview for Pakistan owner-builders — from drawings to keys. Not legal advice; always confirm society and LDA/CDA rules for your plot.

Education

The four main phases

  1. 1

    Design & drawings

    Hire an architect for floor plans, elevations, and structural coordination. Finalize marla coverage, setbacks, and services (electric, plumbing) before any site work. Society may require stamped drawings before NOC.

  2. 2

    NOC & approvals

    Submit to housing society (DHA, Bahria, LDA scheme, etc.) for building plan approval and NOC to start construction. Fees, inspections, and timeline depend on society — often 1–3 months; some phases are faster on possession plots.

  3. 3

    Grey structure

    Foundation, columns, slabs, brickwork, roof, and basic openings — no finishes. Clear BOQ (bill of quantities) with cement, steel, and labour rates. Stage payments tied to slab casts and lintel levels, not vague monthly lumps.

  4. 4

    Finishing

    Plaster, flooring, kitchens, bathrooms, doors, windows, paint, electrical fixtures, and external works. Highest variation in cost — specify brands, tile sizes, and fixture tiers in writing. MEP testing before closing walls.

Typical timelines (5–10 marla house)

Actual duration varies by city, society approvals, weather, and contractor capacity. Add buffer for Ramadan and monsoon.

PhaseTypical
Design & revisions2–6 weeks
Society NOC / plan approval4–12 weeks
Grey structure3–6 months
Finishing4–8 months
Total (design → handover)12–24 months

Design & revisions: Longer if family sign-off or structural redesign

Society NOC / plan approval: DHA/Bahria can be faster on standard designs

Grey structure: ~5 marla: often 3–4 mo; 10 marla: 5–6 mo

Finishing: Premium finishes and imported fittings add time

Total (design → handover): Plan 15–18 months as a realistic midpoint

Red flags when hiring a contractor

Walk away or get a second opinion if you see several of these — especially before signing or paying a large advance.

  • No written contract, BOQ, or payment schedule — only verbal promises
  • Demands 70–100% payment upfront before mobilization on site
  • Refuses society NOC or asks you to build “without files” to save time
  • Cannot show recent completed projects, references, or registered firm details
  • Quote far below market with no breakdown — often low-grade materials or mid-project extras
  • No site engineer or daily supervision; owner told to “trust the mistri”
  • Pressure to skip soil test, termite treatment, or curing time for slabs
  • Cash-only with no receipts; unwilling to align with bank construction finance
  • Subcontractors complain of non-payment — sign of cash-flow risk
  • Changes scope or price after grey structure without written change orders

DealVision provides general education only. Hire a qualified architect/engineer for structural design and obtain official NOCs from your society and development authority.

Material price reference

Manually updated PKR bands — verify with your supplier before procurement

MaterialPrice (PKR)
Cement (OPC)Rs 1,280
Steel (grade 60)Rs 285,000
Bricks (A-grade)Rs 18,500
Sand (Ravi / Chenab)Rs 85

Cement (OPC): 50kg bag — reference May 2026

Steel (grade 60): Mill quotation average

Bricks (A-grade): First-class burnt bricks

Sand (Ravi / Chenab): Delivered clean sand

Contractor directory

Grey structure, finish, and full-build specialists by city

Al-Haram Builders

Lahore

4.6
Grey structure
Full build

LDA-BLD-2019-4421

+92 300 1234567

DHA / Bahria grey structure + turnkey

Raiwind Construction Co.

Lahore

4.2
Grey structure
Finish

+92 321 9876543

Peri-urban Lahore finish work

Capital Finish Works

Islamabad

4.8
Finish

ICT-FIN-2021-088

+92 333 5551212

Premium finish packages

Manually updated PKR bands — verify with your supplier before procurement